Echuca to Deniliquin Deck Replacement
Commercial
Client: V/Line
Value: $140,000
The work consisted of upgrading 7 ARMCO culverts located at Kings Creek (2 no 2400 pipes) and Warringine Creek (4 no 3600 pipes). At each location the culverts support one track with form part of the Frankston to Stony Point Line.
Multiworks was responsible to perform all works to apply a shotcrete lining for the full internal circumference of each steel pipe, apron slab and revetment wall.
Hastings, Victoria
Metro Trains
2015
Civil Construction, Asbestos & Environmental Remediation
Rail & Transport
$430,000