The work consisted of upgrading 7 ARMCO culverts located at Kings Creek (2 no 2400 pipes) and Warringine Creek (4 no 3600 pipes). At each location the culverts support one track with form part of the Frankston to Stony Point Line.

Multiworks was responsible to perform all works to apply a shotcrete lining for the full internal circumference of each steel pipe, apron slab and revetment wall.

Location

Hastings, Victoria

Client

Metro Trains

Completion

2015

Service

Civil Construction, Asbestos & Environmental Remediation

Sector

Rail & Transport

Value

$430,000